000 | 01182nam a22003617a 4500 | ||
---|---|---|---|
999 |
_c43467 _d43467 |
||
001 | DMDOC | ||
003 | OSt | ||
005 | 20180705153112.0 | ||
007 | m | ||
008 | 170426b xxu||||| |||| 00| 0 eng d | ||
040 | _cNDC | ||
086 | _a01965-DM | ||
245 | _aRoseau river hydrolgy/hydraulic study: final report | ||
260 | _aRoseau | ||
260 | _bConsulting Engineers Partnership Ltd. | ||
260 | _cNovember 2009 | ||
270 | _aDominica | ||
300 | _a39 p. | ||
300 | _bill., tbls. | ||
500 | _aDraft final report available | ||
520 | _aExamines the severe encroachment along the north bank to determine the waterway requirement for storm flow conditions after a completed esplanade reclamation. It includes hydrological measurement and calculation, water levels and capacity of the river and photography and designs displaying several points of the river | ||
556 | _aGeneral | ||
650 | _aDomininica | ||
650 | _aStudy | ||
650 | _aHydrology | ||
650 | _aRivers | ||
650 | _aWater | ||
650 | _aDisaster Mitagation | ||
650 | _aFloods | ||
650 | _aRoseau | ||
710 | _aMinistry of Tourism and Legal Affairs | ||
942 |
_2NDC _cGL _h17.05.01 |