000 01240nam a22002657a 4500
001 DMDOC
003 OSt
005 20251216110038.0
008 251210b ||||| |||| 00| 0 eng d
040 _cNDC
086 _a00821-CW
245 _aRepairing of metal guard rails on Roseau bridge: Contract Document
260 _aRoseau :
_bMinistry of public works & ports,
_cDecember 2016.
270 _dDominica
300 _a[24 p.]
_btbls.
520 _aThe ministry & public works and ports of the government of the Commonwealth of Dominica issued a contract document in December 2016 for the repair of metal guard rails of the Roseau bridge. The document outlines the project scope, technical specification, required materials , and safety standards for restoring the bridge protective nail system. It details contractor responsibilities, timelines, and compliance requirements to ensure structured integrity, public safety, and adherence to national engineering and construction guidelines.
556 _aRestricted
650 _aContracts
650 _aContracting
650 _aProject Documents
650 _aBridges
650 _aPhysical Infrastructure
651 _aDominica
942 _2NDC
_cGL
_h04.01.02
999 _c45617
_d45617