Manual on the establishment of a (project) monitoring system; draft

By: Rolfo, Lullian
Publisher: Roseau, Dominica. Economic Development Unit. November 1983Description: 188 p. tbls., illSubject(s): PROJECT IMPLEMENTATION | PROJECT EVALUATION | MANUALS | PROJECT REVISION | DOMINICASummary: The first section of the manual gives instructions on how to modify or up-date project implementation plans. The second section refers to the recording process and outlines a procedure for data collection and recording of data. Procedures and tools to provide project authorities with an information flow on project performance are given in the third section. The next section presents project control levels along with corresponding responsibilities and the functions of each particular post. Operational procedures of the monitoring system are summarized in the final section.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
Grey Literature National Documentation Centre
Dominican Collection
00002-DM (Browse shelf) Available 703

Centre has two (2) copies

The first section of the manual gives instructions on how to modify or up-date project implementation plans. The second section refers to the recording process and outlines a procedure for data collection and recording of data. Procedures and tools to provide project authorities with an information flow on project performance are given in the third section. The next section presents project control levels along with corresponding responsibilities and the functions of each particular post. Operational procedures of the monitoring system are summarized in the final section.

General

There are no comments on this title.

to post a comment.

Powered by Koha